The Côte d’Ivoire-Liberia-Sierra Leone and Guinea interconnection project, known as the “CLSG Interconnection Project”, aims at bridging the energy deficit of these countries by building a 1303 km 225 kV transmission line, 11 new 225 kV source substations including 5 with compensation equipment, two dispatching centres and a regional SCADA and frequency control system.
- COUNTRY: COTE D’IVOIRE-LIBERIA-SIERRA LEONE AND GUINEA
- DURATION OF THE PROJECT: 5 YEARS